About the product
This is a corrective treatment measure by drilling and injecting every one meter around the entire outside perimeter of the house and 1 to 3 times at the site of active infestation within the house. Holes must be drilled from the outside through the outer walls to ensure that the mixture is applied under the floor slab. Flood the mixture into these holes at 5 L holes and seal the holes with cement. The treated soil, which serves as a barrier between the termites and the structure, should in case not be disturbed after treatment. Disturbance of the soil will damage the treated barrier allowing termite access to the structure through disturbed areas.
Price
P 2.5 - P 8.5
Contact with supplier